VW Credit
(HVAC Renovation)

  • SectorMEP Infrastructure Upgrades
  • LocationLibertyville, IL
  • Value1.1 M
  • Size100,000 SF

This project included the complete HVAC Retrofit of the VW Credit Facility, a 40,000 SF, single story building. The scope of work included replacing 24-roof top air handling units, new medium pressure ductwork and new fan powered boxes including temperature controls. The work was performed while the facility was fully operational. DW Hammer produced a phased schedule which allowed the work to be performed during the 2nd shift, thus, the occupants were able to continue working with no disruption. The project was completed on schedule, under budget, with zero change orders.