VW Credit
(Data Center Renovation)

  • SectorMisson Critical
  • LocationLibertyville, IL
  • Size100,000 SF

This project included furnishing and installing (2) 750 KW generators including all associated switchgear and PDU’s. All exterior work was provided including foundations, pre-cast concrete, panels to enclose the generators and sitework. There was also a substantial renovation of the existing data center. All work was performed while the data center and facility was in full operation.