The project consisted of decommissioning the 1st-floor datacenter back to the original state per the lease agreement.
General Construction Demo Scope:
Removed the following raised floor and ceilings.
Fire Suppression Scope:
Decommission of clean agent (FM 200 systems) & double interlocked pre-action dry pipe systems to properly dispose of clean, the following steps must be taken: safety (proper PPE/training), understanding of local regulations, system evaluation, using licensed contractors, safe recovery/capture, transportation, disposal, and documentation.
Mechanical/Plumbing Scope:
Decommission of rooftop condensing units, data center proper perimeter CRAC units, removal of all piping to/from the source, and capped all rooftop openings.
Electrical Scope:
Disconnect and remove all electrical connections from the main electrical distribution, including generators, ATSs, UPSs, and busways. Properly dispose of UPS batteries and diesel fuel.
Project Type:
Mission Critical
Client:
Morningstar
Completion Date:
Project Size:
8,000 Square Feet
Location:
Rosemont, IL