• DWH_Web_CaseStudy_IOS_Desktop DWH_Web_CaseStudy_IOS_Tablet DWH_Web_CaseStudy_IOS_Mobile
  • DWH_Web_CaseStudy_Integrated-Office-Suites_02 DWH_Web_CaseStudy_Integrated-Office-Suites_02_Tablet DWH_Web_CaseStudy_Integrated-Office-Suites_02_Mobile
  • DWH_Web_CaseStudy_Integrated-Office-Suites_03 DWH_Web_CaseStudy_Integrated-Office-Suites_03_Tablet DWH_Web_CaseStudy_Integrated-Office-Suites_03_Mobile
  • DWH_Web_CaseStudy_Integrated-Office-Suites_04 DWH_Web_CaseStudy_Integrated-Office-Suites_04_Tablet DWH_Web_CaseStudy_Integrated-Office-Suites_04_Mobile
  • DWH_Web_CaseStudy_Integrated-Office-Suites_05 DWH_Web_CaseStudy_Integrated-Office-Suites_05_Tablet DWH_Web_CaseStudy_Integrated-Office-Suites_05_Mobile
  • DWH_Web_CaseStudy_Integrated-Office-Suites_06 DWH_Web_CaseStudy_Integrated-Office-Suites_06_Tablet DWH_Web_CaseStudy_Integrated-Office-Suites_06_Mobile
  • DWH_Web_CaseStudy_Integrated-Office-Suites_07 DWH_Web_CaseStudy_Integrated-Office-Suites_07_Tablet DWH_Web_CaseStudy_Integrated-Office-Suites_07_Mobile

Integrated Office Suites
(Co-Working Office Project)

  • SectorMEP Infrastructure Upgrades
  • LocationChicago, IL
  • Size24,000 SF

This project included a 24,000 SF new buildout of office suites, at floors 33 & 34 of the 20 N. Clark Street building. The space included a very high concentration of drywall partitioned private offices to be utilized for rental / leasing. The space also included high-end finishes with a connecting stair between floors 33 & 34, a large cafe, two lobbies, several conference rooms and a main reception area. The project schedule was 12-weeks including demolition, construction and furniture.